8 GeoFroggy

Pipelines

Railways

Total: 608 km (777 km electrified)

Standard gauge: 608 km 1.435-m gauge (2005)

Roadways

Total: 21,846 km

Paved: 11,425 km (4,686 km of interurban roads)

Unpaved: 10,421 km (2005)

Merchant Marine

Ports and Terminals

Bosanska Gradiska, Bosanski Brod, Bosanski Samac, and Brcko (all inland waterway ports on the Sava), Orasje
Year

Airports

  • 28 (2006)

Heliports

  • 5 (2006)

Waterways

  • Sava River (northern border) open to shipping but use limited (2006)

Airports with Paved Runways

  • Total
    8
  • 2,438 to 3,047 m
    4
  • 1,524 to 2,437 m
    1
  • Under 914 m
    3 (2006)

Airports with Unpaved Runways

  • Total
    20
  • 1,524 to 2,437 m
    1
  • 914 to 1,523 m
    7
  • Under 914 m
    12 (2006)