8 GeoFroggy

Pipelines

Gas 147 km; oil 9 km

Railways

Total: 601 km

Standard gauge: 601 km 1.435-m gauge (392 km electrified) (2009)

Roadways

Total: 22,926 km

Paved: 19,426 km (4,652 km of interurban roads)

Unpaved: 3,500 km (2010)

Merchant Marine

Ports and Terminals

Bosanska Gradiska, Bosanski Brod, Bosanski Samac, and Brcko (all inland waterway ports on the Sava River), Orasje
Year

Airports

  • 25 (2012)

Heliports

  • 6 (2012)

Waterways

  • (Sava River on northern border

Airports with Paved Runways

  • Total
    7
  • 2,438 to 3,047 m
    4
  • 1,524 to 2,437 m
    1
  • Under 914 m
    2 (2012)

Airports with Unpaved Runways

  • Total
    18
  • 1,524 to 2,437 m
    1
  • 914 to 1,523 m
    6
  • Under 914 m
    11 (2012)